Lyon du Rhône (France)

Lyon du Rhône (France)

1st construction stage, opening date 2013:

  • Adventure pool with jet stream channel
  • Hydromassage islands
  • Lounge bays
  • Swing grottos
  • Entry stairway
  • Temperature acclimatization zone

2nd construction stage, opening date 2014:

  • 50 m outdoor competition pool with drop side
  • Junction to indoor area

Total water surface: 2.770 m2