Lyon du Rhône (France)

1st construction stage, opening date 2013:

  • Adventure pool with jet stream channel
  • Hydromassage islands
  • Lounge bays
  • Swing grottos
  • Entry stairway
  • Temperature acclimatization zone

2nd construction stage, opening date 2014:

  • 50 m outdoor competition pool with drop side
  • Junction to indoor area

Total water surface: 2.770 m2

Strassen-Bertrange (Luxembourg)

Indoor area:

  • 25 m competition pool with high-diving area
  • Wave pool
  • Teaching pool with elevating floor
  • Children’s pool
  • Whirl- pool
  • Dip tank

Outdoor area:

  • Sauna tank
  • Relaxing pool with bubble jets

Total water surface: 1.096 m2

Wolfsburg (Germany)

1st construction stage, opening date 2001:

  • 50 m competition pool
  • High-diving pool
  • Non-swimmer / adventure pool.

2nd construction stage, opening date 2002:

  • Fun and adventure pool
  • Children’s pool

Total water surface: 2.532 m2

Spittal an der Drau (Austria)

  • 25 m competition pool
  • Adventure pool
  • Children’s pool
  • Sauna dip tank
  • Whirlpool
  • Swim-through passage
  • Opening date: 2008

Total water surface: 873 m2

Ivry sur Seine (France)

  • 25 m competition pool
  • Fun pool
  • Opening date: 2009

Total water surface: 435 m2

Radonbad in Menzenschwand (Germany)

  • Indoor fun pool with integrated hot bubble bath
  • Outdoor fun pool with junction to indoor pool
  • Opening date: 2005

Total water surface: 219 m2

Tropical Islands (Germany)

First construction stage, 2004

In the largest cantilevered hall in the world, the former Cargo Lifter Hall, we built the Tropical Sea with 3.800 m2 and Tropical Lagoon with 1.200 m2 of water surface area Underwater benches, hydromassages, whirlpools, geysers, massage grotto, jet stream channels, secure outlets for water slides.
All pools were mounted from scratch to finish in just five months.

Second construction stage, 2006

The water surface of Tropical Sea was downsized to make room for a children’s pool area and for more “beach space with sand”.

Third construction stage, 2016

Tropical Islands expands into the outdoors and connects the tropical world with the Spreewald natural reserve.
Included in this expansion is the addition of an all-year open-air pool and a summer pool with manifold attractions: lazy river, jet stream channel, hydromassages, swings, massage grotto, wide water slides, and much more.

Grünbeck Logo

Indoor pool Höchstädt a. d. Donau (Germany)

Indoor pool Höchstädt a. d. Donau, (Germany)

Ultrafiltration system GENO-Ultrafil BW-S 90

Combined pool:1/3 non-swimmers area (pool depth < 1.35 m)
2/3 swimmers area (pool depth > 1.35 m)
Dimensions10 x 25 x 0.90 – 1.90 m (w x l x d)

Indoor pool, Dillingen a. d. Donau (Germany)

Indoor pool Höchstädt a. d. Donau, (Germany)

Twin multi-layer filter system GENO-mat BWK 2200 A *S*

Combined pool:1/3 non-swimmers area (pool depth < 1.35 m)
2/3 swimmers area (pool depth > 1.35 m)
Dimensions12.5 x 25 x 0.80 – 3.40 m (w x l x d)

Indoor surf wave at the Jochen Schweizer Arena (Taufkirchen, Germany)

Indoor pool Höchstädt a. d. Donau, (Germany)

2 Filter systems GENO-mat BWK-X 1400 H Triple water softener Delta-p

Surf pool:

Total recirculation capacity:92 m3/h
Total water volume: approx.750 m3
Max. water level:2.3 m

Dimensions

Water supply basin:14.8 x 24.84 m (w x l)
Surf pool:7.7 x 17.2 m (w x l)